• Home
  • Services
    • Facility Construction
    • Pipeline Construction
    • Secondary Containments
    • Coating Solutions
  • Safety
  • Contact
  • Careers
WATTS PROJECTS INC.
  • Home
  • Services
    • Facility Construction
    • Pipeline Construction
    • Secondary Containments
    • Coating Solutions
  • Safety
  • Contact
  • Careers

SECONDARY CONTAINMENTS

Secondary Containment

Watts Projects offers a complete selection of engineered steel containment solutions for the Oil and Gas Industry. We provide various types of geomembrane liners and geotextile fabrics to suit all containment applications, as well as construction projects. We carry stock on hand for immediate installation, which translates to a reduction in wait time for the customer. we can offer you a variety of wall heights, steel gauges, wall colors and accessories to customize and meet your secondary containment needs. Watts Projects is a one stop solution for your containment requirements by offering installation, maintenance, expansion and repairs of new and existing systems. With over 18 years of industry experience, no matter the job requirements, we can get it done.

New System Installations

Services provided with new systems:
- Delivery of containment system 
- Geo and liner installation
- Steel wall assembly
- Dirt work and back fill
- Final site clean-up

Each and every containment installation is completed with the customer in mind. We ensure that our process will not cause a delay to your schedule.
Picture

Boots

​Our boots are designed with high quality, industry proven, material. They can be installed quickly and effectively with no burn through. Installation includes caulking sealant and a stainless steel clamp to ensure no leaks. They can withstand drastic temperature changes without altering the integrity of the boot. The material is also UV resistant to guard against sun wear.
Picture

Liners

Our secondary containment systems use a default 40mm smooth linear low density polyethylene liner. It has similar durability and resistance as high density polyethylene, but with increased flexibility. This translates to a reduction of installation time, improved efficiency as well as a lower rate of liner waste. Every liner is plastic welded and tested prior to being installed, maximizing the consistency of our welds to our customers.
Picture

For Containment inquiries please contact:
Wes Moos
Cell: (403)-318-9282
Office: (403)-358-5555
Email: [email protected]

Employee Login​

Copyright © 2015 Watts Projects Inc
  • Home
  • Services
    • Facility Construction
    • Pipeline Construction
    • Secondary Containments
    • Coating Solutions
  • Safety
  • Contact
  • Careers